Commercial Fit-out

Multi-Storey Self-Storage Facility — Complete Fit-out

A self-storage operator commissioned the complete door fit-out for a new three-storey 600-unit facility. The package combined the signature bright-yellow personal storage doors that have become a defining brand feature, with fire-rated comp

ClientSelf-storage operator (under NDA)
LocationMidlands
SectorSelf-Storage
ServiceSteel Doors + Shopfront + Fire Compartmentation
Duration14 weeks programme
Year2025
Multi-Storey Self-Storage Facility — Complete Fit-out

The brief

Supply and install the full door package: 600+ individual storage unit doors in brand yellow, fire-rated doors between compartments to BS 9999 standards, customer-facing aluminium reception shopfronts, and the main glazed entrance. Schedule had to coordinate with the main contractor's internal partitioning programme without holding up other trades.

Our approach

We split the works into three phases timed to follow the main contractor's partition installation. Phase 1: ground floor entrance shopfront and reception glazing to allow site management to occupy. Phase 2: fire compartmentation doors between unit blocks on all three floors. Phase 3: individual storage unit doors — the bulk of the labour, installed across 60+ working days with a four-installer team. All steel doors were powder-coated to the operator's specified RAL yellow at our supplier's coating line.

Outcomes

Project walk-through

From start to finish

Image sequence showing the project progression — survey, install, completion.

Reception under construction

Reception under construction

Early stage — reception glazing being framed, before final installation of branded panels.

Ground floor entrance

Ground floor entrance

Main entrance shopfront installed and operational, allowing facility management to occupy.

Phase 3 begins

Phase 3 begins

Site team walking the upper-floor corridor as the yellow unit doors begin going in.

Yellow doors fitted

Yellow doors fitted

Signature yellow personal storage unit doors installed and operational.

Detail view

Detail view

Close-up of the yellow door installation showing the powder-coated finish and locking arrangement.

Upper floor

Upper floor

Upper-floor corridor with fire-rated entrance and unit doors completed.

Final corridor

Final corridor

Long corridor view of a completed floor — bright, navigable, and ready for customers.

Technical specifications

Unit doors0.7mm steel skin, fully welded, RAL 1023 powder coat
Fire doorsE60 / EI60 rated, certified to BS 476-22
ReceptionAluminium shopfront with toughened safety glazing
EntranceManual sliding doors with automatic option
Total programme14 weeks, 4-person install team

"Coordinating with our main contractor's tight programme was the make-or-break of this job. S&K hit every phase milestone. The brand yellow looks fantastic — exactly the powder coat we specified."

— Facility operations director
Related services

Services used on this project

Contact us

Speak to our glazing team

Free survey, fixed-price quotes, no pressure sales. Call us, message on WhatsApp, or fill in the form — we typically respond within an hour during working days.

📞
Call us
💬
WhatsApp
✉️
📍
Head office
Unit 1-4, Hembs Crescent, Great Barr
Birmingham B43 5DG

Start a project like this

Tell us about your project — we'll send a fixed-price quote within 24 hours.

We'll never share your details. By submitting, you agree to our privacy policy.